APS Group completed the shop detailing, supply, fabrication and surface coating of structural steel infrastructure for the South Flank Belt Change Stations at Port Hedland, WA. The works were delivered for Ventia in accordance with BHP project specifications.
The scope included structural steel frames, platforms, handrailing, grating, access ladders and self-closing gates. APS provided the full detailing package, material supply, fabrication, surface treatment, trial assembly and freight to site.