Fabrication

Electrical

Modular

Projects

Major Structural Package for BCI Minerals Mardie Salt Project!

FABRICATION
Mardi_Salt 3

APS Group Proudly Supplied Major Structural Package for BCI Minerals Mardie Salt Project!


Working closely with our valued client Geomarine, we provided a major structural steel package for the primary seawater intake station at the Mardie Salt and Potash Project. This project, fully owned by Mardie Minerals Pty Ltd, represents a remarkable opportunity for a large-scale solar evaporation operation on the stunning Pilbara coast in Western Australia.

The Brief

Diverse Capability

Our dedicated team at APS Group took on the challenge to provide, drafting, fabrication, pre-assembly and delivery all structural steelworks and trash screen arrangement. The project required working with a diverse scope of materials including carbon steel, extensive stainless steel works and custom FRP gratings. In our commitment to precise execution, APS also assisted with various design aspects and technical solutions to ensure an overall successful completion.

Mardi_Salt_APS_Project (2)


Stringent Quality Control

Due to the projects location and functionality, APS Group ensured all protective coatings and treatments adhered to the highest standards, safeguarding the structural metals from the harsh marine environment. We maintained comprehensive Inspection & Test Plans (ITPs) and Non-Destructive Testing (NDT) throughout, to guarantee the integrity of every manufactured component, meticulously documented and compiled in the Manufacturing Data Report (MDR)


   

The Results

Delivering Excellence

APS Group ensured that all structural steel items were delivered to the site in the correct sequence, facilitating seamless installation by the clients onsite teams. Each item was clearly labeled with a piece mark, conforming to the design drawings and specifications, streamlining the assembly process.

               Mardi_Salt_APS_Project (16) 

Total Project Supply

The successful execution of the structural supply package by APS Group included the delivery of various critical components, including drop-in service platforms, rubber lined pile clamps, steel support members, handrails, bollards, barrier guard rails, vehicle gates, stainless trash screen panels and support frames, access ladders, walkways and dissipator covers.

 

Contributing to Sustainability

As a company dedicated to sustainable solutions, we take immense pride in contributing to the Mardie Salt and Potash Project’s eco-friendly approach. By working with suppliers that are committed to sustainability, APS Group supports the realization of this unique solar evaporation operation, which holds promising opportunities for responsible resource extraction.

Mardi_Salt_APS_Project (1)
 

APS Group Your Trusted Partner in Industrial Solutions

With over 30 years of experience, APS Group remains committed to excellence, delivering enduring performance and exceeding client expectations in every project we undertake. As a trusted partner, we continue to support various industries, providing innovative and reliable engineering solutions across Western Australia.