APS Group completed the shop detailing, supply, fabrication and surface coating of structural steel infrastructure for the Remote Control Unloading Yard Platform at BHP Newman. The works were delivered for Ventia in accordance with project specifications.
The scope comprised approximately 21 tonnes of structural steel, including columns, beams, bracing, support steel, platforms, handrailing, grating and stairs. APS provided the full detailing package, material supply, controlled fabrication, surface treatment, trial assembly and freight to site.