APS Group delivered two integrated control systems for the Bannock Burn operation in the Goldfields region of Western Australia. System 1 comprised of a soft start pump controller with integrated telemetry connected to the site MIRI network. System 2 consisted of a remote flow monitoring skid featuring multiple flowmeters powered by a solar-fed monitoring panel with battery backup and telemetry. Together, these systems enhanced site visibility, improved operational monitoring, and support reliable performance across remote field infrastructure.